1
.
Lesson Packages
Please work with the PI and co-PIs
to submit at least one lesson package per project to the ICT Connection,
and put yourself as one of the co-submitters.
1
|
|
Ai
Phing LIM
|
(1) |
18 /
167
|
21-Jun-2012 (Thu)
|
31-May-2012 (Thu)
|
20-Jun-2012 (Wed)
|
|||||
2
|
|
Ong
Chee Wah
|
(1) |
22 /
29
|
12-Sep-2012 (Wed)
|
5-Sep-2012 (Wed)
|
12-Sep-2012 (Wed)
|
|||||
3
|
|
YEO
Wee Leng Joshua
|
(1) |
35 /
79
|
5-Jul-2012 (Thu)
|
20-Jun-2012 (Wed)
|
5-Sep-2012 (Wed)
|
|||||
4
|
|
Lim
Ee-Peow
|
(1) |
59 /
255
|
21-Jun-2012 (Thu)
|
30-May-2012 (Wed)
|
21-Jun-2012 (Thu)
|
|||||
5
|
|
Lee
Tat Leong
|
(1) |
27 /
25
|
12-Sep-2012 (Wed)
|
5-Sep-2012 (Wed)
|
12-Sep-2012 (Wed)
|
|||||
6
|
|
Chew
Ling LIM
|
(1) |
17 /
228
|
26-Jul-2012 (Thu)
|
6-Jun-2012 (Wed)
|
5-Sep-2012 (Wed)
|
|||||
7
|
|
YEO
Wee Leng Joshua
|
(2) |
29 /
119
|
4-Oct-2012 (Thu)
|
17-Sep-2012 (Mon)
|
4-Oct-2012 (Thu)
|
|||||
8
|
|
Aloysius
Khoon Song GOH
|
(0) |
27 /
90
|
6-Jul-2012 (Fri)
|
6-Jun-2012 (Wed)
|
6-Jul-2012 (Fri)
|
|||||
9
|
|
Chee
Wah ONG
|
(1) |
47 /
284
|
31-May-2012 (Thu)
|
15-May-2012 (Tue)
|
31-May-2012 (Thu)
|
|||||
10
|
|
GOH
Giam Hwee Jimmy
|
(1) |
38 /
255
|
20-Jun-2012 (Wed)
|
17-May-2012 (Thu)
|
20-Jun-2012 (Wed)
|
|||||
11
|
|
Yip
Kim Wah
|
(0) |
9 / 5
|
17-Jul-2014 (Thu)
|
6-Jul-2014 (Sun)
|
17-Jul-2014 (Thu)
|
|||||
2.
3.
Year-end Reports
Done thanks to ai Phing
Besides the Project Progress
Report/Final Report to be completed by Pis and submitted to eduLab PMO, LDs are
to report on their respective projects based on a template to be provided.
4.
Professor Paco (Creator of EJS) and Wolfgang EJS 4
beginner-intermediate-advance-expert day 25-28 November sign up here http://weelookang.blogspot.sg/2014/06/nrf2011-edu001-el001-invites-2.html please
circulate among your physics friends.
a. So far:
2/30 rizal is from yjc
Please give the PIs and co-PIs a heads-up on the following
events that we have planned for 2015, and build these into the work
plan:
5. Networking session
·
Objective: To scale the practices to more schools
·
Date, time, venue (tentative): AST, 11 Mar 2015 PM
·
Target audience: Representatives from potential adopting schools,
Friends of eduLab, HOD ICT, etc
·
Format (tentative): Each project will be provided with a pull-up banner
(content to be provided by project team), and a space furnished with a
few tables and chairs for sharing and discussion.
·
Presenters: PIs and co-PIs of all eduLab projects (including completed
ones)
More details will be communicated in due course.
state
|
Schools offering A level Physics
|
3 Adapt
|
|
0
anyone?
|
|
2 Adopt
|
|
0
Jimmy got update?
|
|
0
anyone?
|
|
2 Adopt
|
|
3 Adapt
|
|
1 Aware
|
|
3 Adapt
|
|
1 Aware
|
|
1 Aware
|
|
3 Adapt
|
|
1 Aware
|
|
0
|
|
1 Aware
|
|
3 Adapt
|
|
3 Adapt
|
|
1 Aware
|
|
1 Aware
|
|
1 Aware
|
|
1 Aware
|
|
3 Adapt
|
Dear colleagues, any new updates to share??
I know Edwin Lim (HOD Curriculum) and Ken Leong (VP) from PJC, maybe I
can update as 1 aware by today J
6. Presentation at Evaluation
Committee meeting ai
phing
For projects that have not been reported at EC meeting before, the presentation
will take place in mid-May 2015. Please guide the PIs in preparing for the
10-minute presentation. Get them to
focus on showcasing learning gains from the practices, using artefacts as
far as possible.